Transport Canada’s Arctic Drone Project Delayed 2 years by Arms-Control Rules
Transport Canada’s plan to patrol the Arctic with a drone has been delayed by at least two years, partly because the unmanned aircraft is so large it’s considered a kind of missile and falls under complex arms-control rules. The $39.5-million project, approved June 2015, was supposed to see a drone flying patrols by March next […]
The post Transport Canada’s Arctic Drone Project Delayed 2 years by Arms-Control Rules appeared first on UAS VISION.
Source: {$feed_title)
Transport Canada’s Arctic Drone Project Delayed 2 years by Arms-Control Rules